- What makes a construction chart of accounts different?
- What should the job cost section look like?
- What does a sample construction chart of accounts look like?
- Should you add an account for every job or cost code?
- How do job cost codes tie back to the general ledger?
- How do over- and underbillings show up on financial statements?
- How do you set up a construction chart of accounts in QuickBooks Online?
- When should you change your chart of accounts?
- FAQ
- What is a chart of accounts in construction?
- How many accounts should a small contractor have?
- Are cost codes the same as GL accounts?
- Where does retainage go in a chart of accounts?
- One ledger behind every job
By Adam Hicks, CooperBuild AI · November 28, 2026
A construction chart of accounts is the list of general ledger accounts a contractor posts every transaction to, set up so job costs, retainage and over- and underbillings each have their own home. Keep it short: a handful of cost-type accounts for direct job costs (labor, burden, materials, subcontractors, equipment, other), overhead below that, and four construction-only balance sheet accounts. Track the job and the cost code on each transaction, not in extra accounts.
This guide covers how a construction chart of accounts differs from a generic one, a sample layout a small or mid-size GC can adapt, and the setup mistakes that make job reports and the balance sheet disagree.
What makes a construction chart of accounts different?
Every business has assets, liabilities, equity, income and expenses. A contractor adds three things a generic small-business chart doesn't handle well.
Direct job costs sit above gross profit. Labor, materials, subs and equipment that exist only because a job exists go in cost of goods sold (job cost), so gross profit means something. Overhead goes below it.
Retainage gets its own accounts. The National Association of Home Builders chart of accounts lists retentions receivable (amounts customers withhold on progress billings) and retentions payable (amounts withheld from trade contractors until their work is accepted) as separate accounts (NAHB Chart of Accounts (opens in a new tab)).
Over- and underbillings get their own accounts. The same NAHB chart includes costs in excess of billings (underbilling) as an asset and billings in excess of costs (overbilling) as a liability, used by builders on the percentage-of-completion method.
What should the job cost section look like?
Split direct job costs by cost type, not by job and not by every line in your estimate. Intuit's default cost groups for its construction tools are Labor, Material, Equipment, Subcontractor and Miscellaneous (Intuit, cost groups (opens in a new tab)). Most contractor charts land close to that, with labor burden often split out so it stays visible.
Bookkeepers who work with contractors say the same thing. In an r/Bookkeeping thread on construction charts, one suggested COGS accounts for materials, subcontractors, equipment rental, labor and other (permits, testing, waste removal, portable toilets), with each cost coded to its job (Reddit, r/Bookkeeping (opens in a new tab)).
If you're unsure what belongs in burden, see our guide to the labor burden rate.
What does a sample construction chart of accounts look like?
There's no single official numbering. This is an illustrative layout for a small or mid-size GC. Rename lines to fit your work, but keep the ranges and the logic.
| Range | Account | Notes |
|---|---|---|
| 1000s | Operating cash, payroll cash | Reconcile monthly |
| 1100 | Accounts receivable | Billed and due |
| 1150 | Retainage receivable | Held by owners; age it separately |
| 1200 | Costs in excess of billings (underbillings) | Posted from the WIP schedule |
| 1500s | Vehicles, equipment, accumulated depreciation | |
| 2000 | Accounts payable | Vendor and sub bills |
| 2050 | Retainage payable | Held from subs |
| 2100s | Credit cards, payroll liabilities, sales and use tax | |
| 2200 | Billings in excess of costs (overbillings) | Posted from the WIP schedule |
| 2500s | Line of credit, equipment loans | |
| 3000s | Owner equity, retained earnings | |
| 4000 | Contract revenue | Base contract billings |
| 4100 | Change order revenue | Optional; helps CO reporting |
| 5000 | Direct labor | Field wages on jobs |
| 5050 | Labor burden | Payroll taxes, workers' comp, benefits on field labor |
| 5100 | Materials | |
| 5200 | Subcontractors | |
| 5300 | Equipment (rented and owned) | |
| 5400 | Other job costs | Permits, dumpsters, testing, temp facilities |
| 6000s | Overhead | Office rent, office salaries, insurance not charged to jobs, software |
The test for 5000s versus 6000s: if the cost exists only because a job exists, it's a job cost and gets a job. If you'd still pay it with every job shut down, it's overhead.
Should you add an account for every job or cost code?
No. This is the most common mistake. A chart with an account per job, or per estimate line, turns the profit and loss statement into pages nobody reads, and it has to be rebuilt every time a job starts.
The job and the cost code belong on each transaction as tags. The chart of accounts sorts costs by type for the financial statements. Cost codes sort them by phase or trade for the job cost report. In QuickBooks Online, that usually means a project for each job and the project picked on every bill and expense line (Intuit, create projects (opens in a new tab)). Our construction job costing guide covers how to build cost codes from your estimate.
A CPA in a February 2026 r/Bookkeeping thread on construction books gave the same advice: let projects carry the job, let the chart carry cost type, and don't overbuild the chart early (Reddit, r/Bookkeeping (opens in a new tab)).
How do job cost codes tie back to the general ledger?
Map each cost code to one cost type, and each cost type to one GL account. Then the job cost report and the general ledger can be reconciled.
A CFMA forum post explains why: GL cost accounts close out at the end of each period, while job cost codes stay open across periods. To check them, run job cost transactions for one category over a date range and tie the total to the matching GL account (CFMA forum (opens in a new tab)).
If a bill hits the right GL account but the wrong job, or the right job with no cost code, the two reports drift apart. Fix it at entry, not at year-end.
How do over- and underbillings show up on financial statements?
Each month, the WIP schedule compares what you've earned on each job with what you've billed. Earned more than billed is an underbilling (an asset). Billed more than earned is an overbilling (a liability). You post the totals to those two balance sheet accounts with a journal entry. Our WIP report guide walks through the math.
Under the revenue standard, ASC 606, these balances are presented as contract assets and contract liabilities. Baker Tilly notes they should be similar to the costs-in-excess and billings-in-excess balances contractors reported before (Baker Tilly (opens in a new tab)). EisnerAmper notes that under ASC 606 the position is netted at the individual contract level (EisnerAmper (opens in a new tab)). Ask your CPA how they want these presented if your statements go to a surety or bank.
How do you set up a construction chart of accounts in QuickBooks Online?
- Turn on account numbers. They're off by default. Intuit's help explains how to enable them in the chart of accounts settings (Intuit, account numbers (opens in a new tab)).
- Create the four construction accounts. Retainage receivable, retainage payable, underbillings and overbillings. Our guide to retainage in QuickBooks Online shows how to track the retainage side.
- Set up cost-type COGS accounts. Direct labor, burden, materials, subs, equipment, other.
- Turn on projects and use them on every job transaction. Projects are available on QuickBooks Online Plus and Advanced, per Intuit.
- Merge or inactivate the clutter. Old per-job or per-vendor expense accounts make reports harder to read.
When should you change your chart of accounts?
The best time is the start of a fiscal year, so comparisons stay clean. Before you change anything, talk to your CPA: they map your accounts to the tax return, and your surety and bank may review your statements.
Good reasons to restructure: job costs and overhead are mixed in one section, retainage is buried in receivables, there's no place for over- and underbillings, or the chart has grown an account per job.
This article is general information, not accounting or tax advice. Work with a CPA who knows construction to set up or change your chart of accounts.
FAQ
What is a chart of accounts in construction?
It's the list of general ledger accounts a contractor uses to record every transaction. A construction version separates direct job costs from overhead and adds accounts for retainage receivable, retainage payable, underbillings and overbillings.
How many accounts should a small contractor have?
Fewer than most people think. Use a handful of cost-type accounts for job costs and track the job and cost code on each transaction instead of adding accounts. Add detail only when a report you actually use needs it.
Are cost codes the same as GL accounts?
No. GL accounts sort costs by type for the financial statements. Cost codes sort costs by phase or trade inside each job for the job cost report. Map each cost code to one GL account so the two reports reconcile.
Where does retainage go in a chart of accounts?
Retainage the owner holds from you goes in a retainage receivable asset account. Retainage you hold from subs goes in a retainage payable liability account. Keep both separate from regular receivables and payables.
One ledger behind every job
A clean chart of accounts works best when estimates, job costs and the books share one record. CooperBuild AI is an AI-native operating system for general contractors, built on one idea: the estimate is the company. When a proposal is approved, the estimate becomes the live project, and budgets, change orders, pay apps, payments and the general ledger hang off the same deliverables. It has built-in accounting (GL, AP and AR), connects to QuickBooks Online, and takes payments through Stripe.
If you want job costs and the general ledger on one record, start a 14-day free trial (opens in a new tab).