Construction Glossary: Back-Office Terms Every GC Should Know

Construction glossary for GCs: plain-English definitions of contract, billing, job cost, schedule and closeout terms, each linked to a full guide.

Published
Reading time
7 min read
Author
Adam Hicks
On this page10 sections
  1. Why do GCs need a construction glossary?
  2. What do the contract terms mean?
  3. Prime contract
  4. Lump sum vs cost plus
  5. General conditions
  6. Allowance vs contingency
  7. Pay-when-paid vs pay-if-paid
  8. Liquidated damages
  9. No damages for delay
  10. Escalation clause
  11. What do the billing and payment terms mean?
  12. Schedule of values (SOV)
  13. Progress billing
  14. Pay application (pay app)
  15. Retainage
  16. Stored materials
  17. Lien waiver
  18. Prompt payment act
  19. Backcharge
  20. What do the cost and accounting terms mean?
  21. Job costing
  22. Committed cost vs actual cost
  23. Markup vs margin
  24. WIP report, over billing and under billing
  25. Certified payroll
  26. What do the preconstruction and buyout terms mean?
  27. Bid leveling
  28. Exclusions and qualifications
  29. Scope gap
  30. Buyout
  31. Procurement log
  32. What do the field and change terms mean?
  33. RFI vs submittal
  34. Change order vs change directive
  35. T&M ticket
  36. Daily report
  37. OAC meeting
  38. What do the schedule and delay terms mean?
  39. Look-ahead schedule
  40. Pull planning
  41. Time impact analysis (TIA)
  42. Concurrent delay
  43. Differing site conditions
  44. Constructive acceleration
  45. Eichleay formula
  46. What do the closeout terms mean?
  47. Substantial vs final completion
  48. Punch list
  49. Closeout documents and warranty
  50. FAQ
  51. What is a construction glossary?
  52. What is the difference between an RFI and a submittal?
  53. What is the difference between a change order and a change directive?
  54. What does retainage mean in construction?
  55. What is the difference between over billing and under billing?
  56. Spend less time on the paperwork behind these terms

By Adam Hicks, CooperBuild AI · November 18, 2026

This construction glossary defines the back-office terms general contractors use every day: contracts, billing, cost control, schedule and closeout. Each entry gives a one-line definition, a short example, and a link to our full guide when you need the detail.

New project managers, estimators and office staff hear these words in their first week and are expected to use them correctly. Bookmark this page and send it to anyone new on your team.

Why do GCs need a construction glossary?

Construction teams speak a shorthand that is hard to learn from outside the trade. In an r/projectmanagement thread, a construction PM training a new PM (opens in a new tab) asked for help building a list of the "buzz words" PMs use, starting with margin, contingency, liquidated damages, ASI and PCO. In r/ProjectControls, a newcomer asked how to learn project controls terms (opens in a new tab), and the advice was to keep a spreadsheet of terms with definitions and context of use.

This page is that list for the office side of a GC. Definitions are general; your contract's wording always controls.

What do the contract terms mean?

Prime contract

The agreement between the owner and the general contractor. Subcontracts sit underneath it and usually carry its terms down to the trades.

Lump sum vs cost plus

In a lump sum contract the GC builds the scope for a fixed price and keeps or loses the difference. In cost plus, the owner pays actual cost plus a fee. See cost plus vs lump sum.

General conditions

The GC's job-site overhead: supervision, temporary facilities, trailers, cleanup and similar costs that are not one trade's work. See general conditions in construction.

Allowance vs contingency

An allowance is a set amount for a scope item not yet defined, like finishes. A contingency is money held for unknown risk. See allowance vs contingency.

Pay-when-paid vs pay-if-paid

Pay-when-paid sets the timing of a sub's payment. Pay-if-paid tries to make the owner's payment a condition of paying the sub at all. See pay-when-paid vs pay-if-paid.

Liquidated damages

A per-day amount the contractor owes for finishing late, agreed in the contract instead of proving actual losses. See liquidated damages.

No damages for delay

A clause that limits the contractor to a time extension, not money, for owner-caused delays. See no damages for delay clause.

Escalation clause

Contract language that adjusts price if specific material costs rise past a set point. See escalation clause.

What do the billing and payment terms mean?

Schedule of values (SOV)

The breakdown of the contract sum into line items that progress is billed against each month. See schedule of values.

Progress billing

Billing each period for the percent of work complete on each SOV line, instead of one invoice at the end. See progress billing.

Pay application (pay app)

The monthly payment request a GC or sub submits, built from the SOV, with work to date, retainage and amount due.

Retainage

A percentage of each payment held back until the work is complete, as security that the job gets finished. See retainage in construction.

Stored materials

Materials delivered or stored off-site but not yet installed, which some contracts let you bill for. See stored materials billing.

Lien waiver

A document where a contractor or supplier gives up lien rights for a payment, conditional on receiving it or unconditional once paid. See conditional vs unconditional lien waivers.

Prompt payment act

A state or federal law that sets deadlines for paying contractors and interest on late payments. See prompt payment act.

Backcharge

A deduction a GC takes from a sub's payment to recover costs the GC paid to fix or finish the sub's work. See construction backcharge.

What do the cost and accounting terms mean?

Job costing

Tracking every cost against the job and cost code it belongs to, so you know if each job makes money. See construction job costing, or QuickBooks job costing for contractors for the QuickBooks setup.

Committed cost vs actual cost

Committed cost is what you have signed to spend through subcontracts and POs. Actual cost is what has been billed or paid. See committed vs actual costs.

Markup vs margin

Markup is profit as a percent of cost. Margin is profit as a percent of the selling price, so the same dollars give a smaller margin number. See markup vs margin.

WIP report, over billing and under billing

A work-in-progress report compares what you have billed on each job to what you have earned. Billing ahead of earned revenue is over billing; billing behind it is under billing. See construction WIP report.

Certified payroll

Weekly payroll reports showing prevailing wages paid on public jobs that require them. See certified payroll.

What do the preconstruction and buyout terms mean?

Bid leveling

Comparing sub bids line by line so you are pricing the same scope. See subcontractor bid leveling.

Exclusions and qualifications

The parts of a bid that say what is not included and what assumptions the price depends on. See bid exclusions and qualifications.

Scope gap

Work no trade carried because it fell between two scopes. See scope gaps.

Buyout

Signing subcontracts and purchase orders after award, and comparing them to the estimate. See buyout process.

Procurement log

A tracker for long-lead materials from submittal to delivery. See procurement log.

What do the field and change terms mean?

RFI vs submittal

An RFI (request for information) asks the design team a question about the documents. A submittal asks them to review a product or shop drawing before it is ordered or installed. See what is an RFI and what is a submittal.

Change order vs change directive

A change order is an agreed change to scope, price or time, signed by both sides. A change directive orders the work to proceed before price or time is agreed. See change order process.

T&M ticket

A daily record of labor, equipment and material used on time-and-material work, signed in the field. See T&M tickets.

Daily report

The superintendent's record of each day's manpower, work, weather, deliveries and issues. See construction daily report.

OAC meeting

The regular owner-architect-contractor meeting. See OAC meeting.

What do the schedule and delay terms mean?

Look-ahead schedule

A short-range schedule, often three weeks, that breaks the master schedule into crew-level work. See 3-week look-ahead.

Pull planning

A planning session where trades work backward from a milestone and commit to handoffs. See pull planning.

Time impact analysis (TIA)

A schedule analysis that shows how a specific event changed the completion date. See time impact analysis.

Concurrent delay

Owner and contractor delays that overlap on the critical path. See concurrent delay.

Differing site conditions

Physical conditions at the site that differ from what the contract shows or what is normal. See differing site conditions.

Constructive acceleration

When an owner refuses a valid time extension and effectively forces the GC to speed up. See constructive acceleration.

Eichleay formula

A three-step formula that prices unabsorbed home office overhead when an owner suspends or delays a job and the GC is stuck on standby. See Eichleay formula.

What do the closeout terms mean?

Substantial vs final completion

Substantial completion is when the owner can use the work for its purpose. Final completion is when everything, including the punch list, is done. See substantial vs final completion.

Punch list

The list of incomplete or defective items to fix before the job is accepted. See what is a punch list.

Closeout documents and warranty

Closeout documents are the warranties, manuals, as-builts and releases turned over at the end. The warranty period is when you must return to fix defects. See closeout documents and warranty period.

FAQ

What is a construction glossary?

A construction glossary is a list of the terms used on construction projects, with a short plain-English definition for each. This one focuses on the contract, billing, cost, schedule and closeout terms a GC's office uses.

What is the difference between an RFI and a submittal?

An RFI asks the design team a question about the drawings or specs. A submittal asks the design team to review a specific product, shop drawing or sample before it is ordered or installed.

What is the difference between a change order and a change directive?

A change order is signed by both sides and settles scope, price and time. A change directive tells the contractor to proceed before price or time is agreed, and the adjustment is settled later.

What does retainage mean in construction?

Retainage is a percentage of each progress payment that is held back until the work is complete, as security that the contractor finishes the job.

What is the difference between over billing and under billing?

Over billing means you have billed more on a job than you have earned to date. Under billing means you have earned more than you have billed.

Spend less time on the paperwork behind these terms

Every term above comes with paperwork: logs, pay apps, change orders, cost reports. CooperBuild AI keeps estimates, project chat, tasks and job costs in one place, and its in-chat assistants pick up action items from your team's conversations, like "send the RFI on the stair detail," so they turn into tracked tasks. It includes built-in accounting with GL, AP and AR, connects to QuickBooks Online and supports integrated payments through Stripe.

Get started with a free trial of CooperBuild AI and cut the paperwork drudgery out of running your jobs.

Written by

Adam Hicks

Get started

Run your next job in Cooper.

Start on free credit and run a real job this week, or book a 30-minute demo on your own spec set, estimate or card statement. Either way, no card and no contract.

$20 in free credits, no card needed