- Which QuickBooks Online plan do contractors need for job costing?
- How do you set up Projects for job costing in QuickBooks Online?
- How do you track cost codes in QuickBooks?
- How do you get labor costs onto a job in QuickBooks?
- Which QuickBooks reports should a GC run?
- What can't QuickBooks job costing do for a GC?
- FAQ
- Can you do job costing in QuickBooks Online?
- Which QuickBooks plan is best for construction job costing?
- Does QuickBooks Online have cost codes?
- How do I add labor costs to a job in QuickBooks Online?
- Does QuickBooks track committed costs for contractors?
- Keep the job, the costs and the books together
By Adam Hicks, CooperBuild AI · November 18, 2026
QuickBooks job costing for contractors works through Projects in QuickBooks Online Plus or Advanced: you create one project per job, tag every bill, expense, timesheet and invoice to it, and read the Project profitability report. It handles costs and income per job well. It does not give you trade-level cost codes, committed costs or a company-wide WIP schedule out of the box, so most GCs add a simple coding scheme and track those pieces alongside it.
I run a construction company of about 30 people alongside CooperBuild AI, and "is QuickBooks job costing worth it?" is one of the most common questions small GCs ask each other. A March 2026 r/Contractor thread from a cost-plus remodeler running one to five jobs on QuickBooks Simple Start asked exactly that. This guide covers what QuickBooks Online can do, how to set it up for a GC, and where the gaps are.
Which QuickBooks Online plan do contractors need for job costing?
You need QuickBooks Online Plus or Advanced. Intuit's help pages say Projects is available in Plus, Advanced and Intuit Enterprise Suite, and class tracking is only available in Plus and Advanced, not Simple Start or Essentials (Intuit: Create projects (opens in a new tab), Intuit: Create and manage classes (opens in a new tab)).
The difference that matters most for GCs: Intuit says that with Advanced you can set up project estimates and track estimate versus actuals on the project dashboard and reports. On Plus, you see income, costs and margin per project, but not a budget-versus-actual view. A summary of Intuit's plan pages by Books and Trucks (opens in a new tab) (checked October 2026) also notes Plus is capped at 40 classes and locations, while Advanced is unlimited. Check Intuit's current plan page before you buy, since plans and limits change.
How do you set up Projects for job costing in QuickBooks Online?
The setup is short:
- Turn on project tracking in Account and settings before you create a project, as Intuit's help page notes.
- Create one project per job. Each project belongs to one customer. Start and end dates are optional.
- Tag every transaction to the project. On bills, checks, expenses, estimates and invoices, choose the project in the Customer/Project field. Mark costs billable if you plan to pass them through on a future invoice, which matters on cost-plus work.
- Mark projects completed at closeout so the active list stays clean.
The rule that makes or breaks it: code the cost when it is entered, by someone who knows which job it belongs to. If receipts sit in a folder until month-end, half of them land in the wrong job or nowhere.
How do you track cost codes in QuickBooks?
QuickBooks Online has no field called "cost code." Contractors usually pick one of two workarounds:
- Products and services as cost codes. Create items such as "03 Concrete - Sub" or "09 Drywall - Material" and use them on the item lines of bills and invoices. Reports by item then show cost per trade.
- Classes as cost codes. Turn on class tracking (Settings, Account and settings, Advanced, Categories) and create classes for your main trades or cost types. Intuit allows sub-classes up to five levels deep. Watch the Plus class limit if you go this route.
Whichever you choose, keep the list short and match it to how you estimate. Twenty to forty codes that mirror your estimate beat a 300-line master list nobody remembers. Our construction job costing guide covers how to build that list.
How do you get labor costs onto a job in QuickBooks?
Labor is where most small GCs lose the thread. Intuit's help page on adding labor costs to a project says Plus and Advanced let you track time worked by employees and contractors and use it to calculate project profitability (Intuit: Add labor costs to a project (opens in a new tab)). In practice that means one of two methods:
- Time with an hourly cost rate. Enter each person's loaded cost rate, record time to the project, and QuickBooks applies the cost.
- Payroll cost allocation. Intuit's product page says allocating payroll costs by class or project is only available on QuickBooks Workforce Premium and Elite, with QuickBooks Online Plus, Advanced or Intuit Enterprise Suite (Intuit: Products (opens in a new tab)).
If you use an hourly cost rate, load it properly: wages plus employer taxes, workers' comp and benefits. A bare wage rate makes every job look more profitable than it is.
Which QuickBooks reports should a GC run?
Intuit's Project profitability reports tutorial points to three views: profit margin for each project, time cost by employee or vendor, and unbilled time and expenses (Intuit: Project profitability reports (opens in a new tab)).
Run them on a schedule, not only at closeout:
- Weekly: unbilled time and expenses, so pass-through costs on cost-plus jobs actually get billed.
- Every two weeks: project profitability on active jobs, checked against your estimate. On Advanced, use estimate versus actuals.
- Monthly: time cost by employee, to see if crews are coding hours to the right job.
What can't QuickBooks job costing do for a GC?
Be honest about the gaps before you build your process around it:
- Committed costs. QuickBooks records bills and payments. A signed subcontract or purchase order that hasn't been billed yet doesn't show up as cost, so a job can look healthy until the invoices arrive. See committed costs vs actual costs.
- Company-wide WIP. In a March 2026 r/Construction thread on WIP reports with QuickBooks, one reply said they pull job costing from QuickBooks Online and do the WIP calculations in a spreadsheet. Our WIP report guide shows the math.
- Construction billing details. Progress invoicing exists, but schedule of values billing and retainage usually take workarounds. Our progress billing guide covers the monthly cycle.
- Field context. Change orders, daily reports and the chat where a super says "we're adding two days of cleanup" all live somewhere else, so someone has to re-key them.
None of this means QuickBooks is the wrong tool. For a GC running a handful of jobs, Plus with clean coding is often enough. The gaps grow with the number of jobs and the number of people entering costs.
FAQ
Can you do job costing in QuickBooks Online?
Yes. QuickBooks Online Plus and Advanced include Projects, which let you tag income, bills, expenses and time to a job and run project profitability reports.
Which QuickBooks plan is best for construction job costing?
Plus covers Projects and class tracking. Advanced adds project estimates and estimate versus actuals reporting, which is what most GCs want for budget tracking.
Does QuickBooks Online have cost codes?
Not as a dedicated field. Contractors usually use products and services items or classes as cost codes, matched to the structure of their estimates.
How do I add labor costs to a job in QuickBooks Online?
Record time to the project with a loaded hourly cost rate, or use payroll cost allocation by project, which Intuit lists for QuickBooks Workforce Premium and Elite.
Does QuickBooks track committed costs for contractors?
No. QuickBooks records bills and payments, so signed subcontracts and purchase orders that haven't been billed must be tracked separately to see projected final cost.
Keep the job, the costs and the books together
If you're re-keying change orders and field notes into QuickBooks, CooperBuild AI may help. It keeps estimates, projects, team chat and job costs in one workspace, with built-in accounting (GL, AP and AR). It also connects to QuickBooks Online if you want to keep your books there, and supports integrated payments through Stripe. Its assistants can pick up action items from project chat so cost-related follow-ups don't get lost.